Waterproofing done right the first time, then tile, fixtures and finish carpentry to match — built to last as long as the house.
The difference is almost never the tile you can see. It's the waterproofing membrane, the slope of the shower base, the sealed penetrations and the ventilation behind it — the work that gets covered up and never inspected again.
We build those layers properly because we're the ones setting the tile over them. Nothing is rushed to get to the finish, and nothing is hidden that we wouldn't be comfortable showing you first.
It's also a room your household needs. We schedule the work tightly, keep the site clean, and tell you honestly which days will be the disruptive ones.
Everything below is coordinated under one contract, with one point of accountability.
In-house drawings, fixture planning, and a layout confirmed before anything is ordered.
Old tile, tub, vanity and subfloor removed back to studs, with dust control throughout.
Wall changes, niche and bench framing, and solid blocking for grab bars and vanities.
Licensed trades for relocated drains and supply, exhaust ventilation, pot lights and heated floors.
Membrane systems, sloped shower bases, sealed corners and penetrations — done to manufacturer spec.
Wall and floor tile, niches, vanity and fixture install, then trim and finish carpentry — self-performed.
Most bathrooms run three to five weeks on site, depending on scope and fixture lead times.
On-site walkthrough, measurements, and an honest conversation about scope and budget.
Layout drawn, tile and fixtures selected, trades scheduled, and a written quote you can plan around.
Demo through rough-in and waterproofing, then tile, fixtures and finish carpentry.
Punch list, full cleanup, and a final walkthrough together before it's called done.
We'll walk you through the options at our suppliers and give you a straight opinion on what's worth spending on.
Porcelain, ceramic and natural stone for walls, floors and niches — set by hand.
Custom and stock vanities with quartz or solid-surface tops, sized to the space.
Tubs, showers, faucets and frameless glass, specified to suit the layout and budget.
In-floor heating mats installed under tile — the upgrade nobody regrets.
Most bathrooms run three to five weeks on site once demolition starts. Custom glass and special-order tile are the usual delays, so we order early and schedule around delivery.
We plan single-bathroom jobs differently: tighter scheduling, trades stacked where possible, and the toilet reinstalled as early in the build as it can be. We'll tell you exactly which days it's out of service.
A full membrane system behind tile in all wet areas, with sloped bases, sealed corners and sealed penetrations, installed to the manufacturer's specification. We're happy to show you the system before it gets covered.
Replacing fixtures in the same locations usually doesn't. Moving plumbing, altering walls or changing the layout typically does. We'll tell you at the consultation and handle the permit process where one is required.
Yes — curbless showers, wider doorways, blocking for grab bars, comfort-height fixtures and non-slip tile. Worth planning now even if you don't need it yet.
The quote is what you pay unless you change the scope or we uncover something behind the walls — rotted subfloor, old plumbing, hidden water damage. If that happens, you'll see the cost before any work goes ahead.
Free on-site consultation, no obligation. Serving Chatham, Blenheim, Wallaceburg, Tilbury and surrounding Chatham-Kent.
Book a Free Consultation